Title: DISCUSSION AND ACTION – PRELIMINARY SITE PLAN: Berkeley Square Addition, Block 1, Lots 1R & 4-6
Attachments: 1. Agenda Item Memo, 2. Locator Map, 3. Preliminary Site Plan, 4. Applicant Letter - Essential Construction, 5. Applicant Letter - Morgan, 6. Applicant NGBS vs LEED Sheet
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

Discussion and Action - Preliminary Site Plan: Berkeley Square Addition, Block 1, Lots 1R & 4-6

applicant end

Applicant: Berkeley Square (EDENS)

Case Planner: John Kim, AICP

end

DESCRIPTION:

header

356 multifamily residence units and shopping centers on four lots on 15.3 acres located on the north side of Park Boulevard, 275 feet west of Ohio Drive.  Zoned Retail with Specific Use Permits No. 92 for Private Club, No. 148 for Day Care Center, No. 169 for Massage Establishment, No. 488 for Private Club, and No. 652 for Theater-Regional and located within the Preston Road Overlay District.  Project #PSP2026-016.  (Legislative consideration of alternative multifamily design standard)

 

end

STAFF REPORT - REMARKS & RECOMMENDATION

REMARKS:

The purpose for the preliminary site plan is to show two proposed multifamily residences on two lots and an existing shopping center on two lots.  With the proposal, a small cul-de-sac portion of Early Morn Drive is proposed to be abandoned and continued as a quasi-public street.  The request also includes deferral of required mitigation to the preliminary plat stage and a request to use an alternative sustainable building design for the multifamily buildings.

 

Early Morn Right-of-way Abandonment

 

As part of this request, the applicant is proposing to abandon a portion of the Early Morn Drive cul-de-sac located within the property.  This section of Early Morn Drive will be converted to a quasi-public street with an extension south to Park Boulevard and a stub for future connectivity to the west.  City Council approval of the right-of-way abandonment through a separate ordinance will also be required.

 

Water & Sewer Capacity Study

 

Section 3.1.B.b.2.(a) of the Subdivision Ordinance requires a Water & Sewer Capacity Study to determine the water and wastewater demand associated with proposed development at the first required step of the Site Plan Review Process, which in this case is the preliminary site plan.  The ordinance allows any required mitigation resulting from the study to increase capacity, such as upsizing public infrastructure or contributing to a capital improvement, to be conditioned as part of approval of the preliminary site plan.  Where city participation is proposed, a development agreement is also required.

 

A Water & Sewer Capacity Study has been submitted for this project and is currently under review by the Engineering Department.  Preliminary results have determined there is not existing capacity to serve the development; however, the appropriate mitigation to increase capacity has not yet been determined.  The applicant acknowledges that an improvement will be necessary but is requesting to defer the final determination of appropriate mitigation measures to the time of preliminary plat.  If deferred, the applicant will be required to construct the required mitigation.  If the applicant does not agree to the required mitigation, the preliminary plat will not be approved.

 

Alternative Sustainable Building Design Standard

 

Section 7.A of the Design Standards for Multifamily and Mixed-Use Residential Developments (Design Standards) requires newly constructed buildings must be Leadership in Energy and Environmental Design (LEED) certified by the U.S. Green Building Council.  However, the applicant is requesting permission to construct the proposed buildings in accordance with the National Green Building Standard (NGBS), a certification program similar to LEED but focused on residential construction.  LEED provides a broad sustainability framework applicable to various building types, while NGBS focuses primarily on residential construction and development.  Both programs promote energy and water efficiency, resource conservation, and occupant health. 

 

Section 1.D of the Design Standards allows applicants to request a waiver or modification of these requirements, provided the request meets the following criteria:

 

i.                     Does not result in a site condition that is consistent with the spirit and intent of the requirement;

 

Upon review, staff finds that NGBS may be a suitable alternative to LEED certification.  Although not identical to LEED, the NGBS aims to provide similar green building initiatives and is consistent with the spirit and intent of Section 1.D of the Design Standards.  The applicant's willingness to consider an alternative green building standard shows a willingness to meet the intent of the Design Standards through an alternative certification program.

 

ii.                     Does not result in an unnecessary encumbrance on another parcel of land; and

 

Allowance of NGBS as the building standard is not anticipated to encumber any of the adjacent properties. 

 

iii.                     Is not solely based on economic gain or loss.

 

The applicant’s request is to provide an alternative program generally equivalent to the city’s standard for sustainable building design.  Although costs for NGBS certification may be less than LEED certification, the request is not based solely on the economic gain or loss to the applicant.

 

The Commission should consider the applicability of each program (see Attachment 5) to the proposed development, associated costs, housing affordability, and alignment with community sustainability goals when evaluating the request.  If the Commission determines that the request meets the criteria in Section 1.D of the Design Standards, staff recommends directing staff to revise Section 7.A of The Design Standards for Multifamily and Mixed-Use Residential Development to allow all newly-constructed multifamily buildings to comply with either NGBS or LEED certification requirements.

 

RECOMMENDATION:

Recommended for approval subject to the following:

1.                     City Council approval of the abandonment of Early Morn Drive right-of-way as shown in the preliminary site plan; and

 

2.                     Recommended mitigation from the Water and Sewer Capacity Study to be provided by the applicant at the time of preliminary plat.

 

Attachments:

1.                     Locator Map

2.                     Preliminary Site Plan

3.                     Applicant letter - Essential Construction

4.                     Applicant letter - Morgan

5.                     Applicant NGBS vs LEED Sheet