DESCRIPTION:
header
Electrical substation on one lot on 1.9 acres located on the west side of Parker Road, 1,130 feet south of Los Rios Boulevard. Zoned Agricultural. Project #PP2025-011.
end
body
REMARKS:
The purpose of the preliminary plat is to create a lot out of previously unplatted land and dedicate easements for the proposed electrical substation and related site improvements. As part of this request, a variance to the Subdivision Ordinance is requested to allow a flag lot less than two acres in size and to allow only one point of access. A preliminary site plan (PSP2025-022) showing the proposed lot configuration was conditionally approved by the Planning & Zoning Commission (P&Z) on November 3, 2025, subject to the Board of Adjustment (BOA) granting a Zoning Ordinance variance for minimum lot size. The BOA variance was granted on December 9, 2025.
Frontage Requirements – Section 5.2.c.3(a)
The minimum street frontage for non-corner lots along Parker Road is typically 150 feet; however, Section 5.2.c.3(a) of the Subdivision Ordinance allows the minimum frontage of any non-corner lot to be reduced to 24 feet if:
The lot is greater than two acres; and
The lot has one direct access to a public street.
This type of lot configuration is commonly referred to as a “flag lot.” The subject property is a non-corner lot with 65 feet of frontage and a lot area of 1.87 acres. A variance is required to approve a flag lot less than two acres in size.
Access Requirements – Section 5.2.c.4(a)
Section 5.2.c.4(a) of the Subdivision Ordinance requires that all nonresidential lots shall have a minimum of two points of access to public streets. P&Z is authorized to grant a single point of access if it determines that a second point of access cannot be obtained and traffic safety a...